DRAWINGS - MEDIUM AND LARGE PROJECTS (OBC PART 3) 

PARISH HALL

I was given this project from early design drawings and asked to develop a full set of working drawings. Tasks also included OBC review and coordination with engineers.

Design Firm: CXT Architects 

 ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------  

BUS TERMINAL

 On this project, I was directly involved  from the beginning. I met with the consultants and client representatives to help refine the final design and as job captain and senior draftsman I was involved in the development of drawings from design development to tender documents.

Design Firm: Paul Johnston Architect 

 --------------------------------------------------------------------------------------------------------------------------------------------------------------------------- 

MANUFACTURING PLANT

On this project I was directly involved in all aspects from design to construction supervision. I produced the majority of CAD drawings and I oversaw the team who helped with the production of drawings. The owners were so pleased with the project that when they went ahead with phase 2, they insisted the very same team of consultants be involved.

Design Firm: CXT Architects 

 ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------  

2 STOREY RETAIL/COMMERCIAL BUILDING

On this project, I  produced the majority of the working drawings and assisted with the design. 

Design Firm: Paul Johnston Architect 

 ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------  

RAIL OPERATIONS CONTROL CENTRE

This highly technical project required my involvement from the onset. I attended all early design discussions with all the owner representatives and I was directly involved in the design and the production of construction drawings. I also oversaw the work of the CAD team. A large part of my focus was on the design and construction drawings for the operators' workstations. I also carried out the duties of contract administration.

Design Firm: Paul Johnston Architect 

 ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------  

RAILWAY STATION

This project, although smaller in scope, was very complex in nature. I produced the majority of CAD drawings and coordinated with the team of consultants.

Design Firm: Paul Johnston Architect